One things leads to another. A question about the factory-installed rudder cables got me started down the road of test-fitting the vertical stabilizer. I was very pleased to find that it was easy to do and the fit appears to be excellent.
I hadn’t really expected to do this step just now. But, in order to evaluate much about the rudder cables, the entire control mechanism for the rudder and steerable nose-wheel needs to in place and adjusted. I learned this during a customer support exchange with Sling Aircraft’s Jean d’Assonville. I’d called him because I was concerned that the rudder cables may have been installed improperly during factory the quick-build of my fuselage. Jean assured me that it was very unlikely that the cables were wrong.
I was wondering because the KAI talks about one cable being slightly longer than the other. Somehow they seemed to be the other way around. Jean said that the only way to properly evaluate the setup would be to assemble everything. It only takes 15 minutes, he tells me! LOL. But, he really meant it!
It’s going to take me hours and hours, over days and days, to get the entire rudder control mechanism in place. That’s not only because I’m slow and plodding, but also because I’m not ready to install the nose-wheel yet. It’ll all just have to wait until I get the avionics rack, LRU’s and harness in place while the wheels are off and the fuselage is low and as easily accessible as it can be.
So then. I still don’t know for certain that the rudder cables are installed properly. But, I did get inspired to get the VS out from storage in the house and get it fitted on the fuselage. Technically, that’s progress! The nice fit between the fuselage and vertical stabilizer is satisfying too.