Over a couple of sessions, I’ve installed additional m4 rivnuts, permanently riveted together the VS structure and mounted the VOR antenna base to Rib 004 – previously reinforced with its doubler.
Edge grommets have been applied to lightening holes of the rear channel and rib 003. I’ve elected to replace the factory-supplied rubber grommets with Heyco 0.375in nylon snap-bushings – to protect the coax and strobe light wiring where it passes through the VS structure. I enlarged the forming holes to 9.5mm, as directed. The forming holes at the front of ribs 002 and 003 were similarly enlarged to accommodate the bushings for my (optional, build-specific) VOR antenna coax cable. Routing the coax near the front of the structure is intended to keep the cable clear of the ‘works’ for the elevator.
After a bit of experimentation with my newly acquired rotary coax stripper, I installed the Amphenol BNC male connector to the RG-400 coax cable. As mentioned in a earlier post, I’ve decided to use M27500-20TG4T14 for the strobe – rather than the factory-supplied PVC jacketed wire. Some heat shrink tubing bulks up the cables as they pass through the bushings and the edge grommets. A few dollops of aluminum-compatable gasket-forming RTV locks down the bushings and the cables to the structure. I don’t want any movement from vibration.
I spent several work sessions to make sure I can expect good results when it comes time to close up the VS by riveting the skin to the underling structure. By that time – the VOR antenna, its RG-400 coax cable and the tail strobe wiring must be in place and will be expected to last the lifetime of the aircraft. No pressure!
Holes around the edges of the skin were typically large enough to accommodate 3,2 x 8mm domed rivets, but the holes in the skin at the interfaces with the ribs were smaller and needed to be enlarged with a #30 straight flute chucking reamer. All holes in the skin were carefully deburred. Overall, the concentric alignment of holes in skin and structure were pretty good, but a few will need to be match-reamed during the final fit, immediately prior to the riveting.
The antenna base required 4 recesses be machined into the plastic-like material that allow shortened rivets to fit without interference. My trusty Dremel Tool did both jobs handily – shortening the rivets and creating the recesses.
I’ve had the empennage sub-kit since late July. Today – finally, in November – I’m very pleased to have pulled my first rivets.
It’s taken me this long to get my act together to the point of seeing my way clear to assemble a few parts. As is happens, the VS rear channel is a good starting point.
If things weren’t exciting enough for one day – I opened an email from Barry Jay (TAF) and was surprised to find first pictures of my factory quick-build. The fuselage is built up with evidence of many alodined parts and even some gray paint on interior spaces.
Incorporating a VOR antenna keeps my options open. The antenna gets built permanently into the VS structure. I have to commit to the antenna choice now, but not the avionics. The Rami AV-520 happens to be an ideal size and has removable whiskers. If I eventually decide that I don’t want or truly need VOR/LOC/GS capability, the whiskers come off and the VS of the bird is clean.
Optimum mounting the antenna requires a little custom fabrication. A doubler plate must be positioned and the mating rib drilled for rivets. I ordered the doubler base-plate part number from TAF. The top VS rib gets modification to accommodate the whiskers and provide access to set-screws.
The fabrication process I undertook was a variation of what is described in the Empennage Construction Manual, pp. VS4. Eventually, small holes also need to be located and created in the VS skin to accommodate the whiskers and tool access to the set-screws. Careful positioning of the antenna base allowed me to minimize impacts to the VS top rib and the skin.
Rivet clearance areas need to be machined into the (hard plastic-like) antenna base. Several rivets also need to be shortened. The general process for rivet shortening is in the construction manual. There are places where space is tight and a bit of finesse helps to achieve good fit.
I’ve finally gotten to the point of acomplishing the very first step on page VS1 in the Empennage Construction Manual! I’d been worrying about it. Getting the rivnuts securely mounted calls for a rather deliberate process with good technique. It all went very well. What a relief.
Having an effective tool – Astro Pneumatic Tool ADN14 Rivet Nut Drill Adapter Kit – and practice made the day. I’ve seen a couple of other builders recommend this particular tool. Because it relies on a cordless drill motor and identification of an appropriate torque (clutch) setting, I felt there would be a good chance of getting consistently good results. This seems to be the case.
Practice! I got an assortment of metric rivnuts and used the tool to work with them until I knew exactly what to expect. Now I have 14 perfectly mounted rivnuts!
BTW – the KAI mentions using high strength Loctite to insure that the mounted rivnuts don’t slip in their holes. I say – learn how to mount them firmly and they won’t slip. No Loctite is needed. Because IMO – if they’re not tight enough to stay put, then they’re not satisfactorily mounted.
Over the course of 3 days, I got my feet wet with metal preparation and applying self etching primer. Deburring seems pretty straight forward. I got great results on small holes using the Avery Tools Speed Deburr and Countersink tool. I started out using a file to smooth edges, but I as I transitioned to my Scotch-Brite cut and polish wheel (C/P 7A-Med), I gained confidence and proficiency.
Next, I did an initial degrease step outdoors with acetone and paper towel. This also seems to get much of the material identification printing off of the surface. Then, I did a second cleaning with Simple Green Extreme Aircraft in 3:1 solution with distilled water, rise with water and dry. From this point, nitrile or white cotton gloves handling is in play.
My etching and conversion coating results are probably adequate, but not anywhere near as lustrous as others have masterfully achieved – notably those by Des Howson for his Sling 2 Taildragger build.
Working with Bonderite C-IC 33 Aero (Alumiprep) and M-CR Aero 1201 (Alodine) proved a little more challenging for me than deburring. I have to work outdoors with a mortar tub, garden hose and cold well water. It’s chilly too. I’m economy minded, so I’ve opted to use a [silicone basting] brush application technique with solution concentrations called out by the technical process bulletins published by Henkel.
The tiny batch of PTI epoxy primer I got from Aircraft Spruce was completely unusable, with clumps thicker than clay and no luck trying to thin/reduce. I had intended to use it to prime the rear channel parts of the vertical stabilizer. To avoid further delay, I just went with self-etching primer.
It’s autumn now, and already too cool to prime parts outside. I need a place in my shop to do it. I tried a cardboard box on a workbench, but quickly decided that a ventilated booth is required.
With about $8 worth of 1×2 wood strips and $20 of plastic sheeting, a $12 dryer duct, and an existing space heater (w/fan) — I was able to quickly build a 4′ x 5′ x 9.5′ tall spray booth.
I only need to work with relatively small parts. The longest pieces in the empennage are only a few feet long and can be suspended with a vertical orientation. Ventilation is minimal. Hopefully it will be enough.
There was lots of good information and practical hands-on work at the EAA SportAir Workshops this weekend. The Museum of Flight Restoration Center at Paine Field (Everett, WA) makes for a great venue.
Sling builders were well represented, with 3 active projects and at least a couple prospective Sling TSi-leaning workshop attendees. It was nice to see and chat with fellow builder Philip Rueker, taking part in the Electrical course.
I didn’t quite finish my project, but they gave me a certificate anyway. I’m so glad I chose a Sling 2 kit with pulled rivets. I would be absolutely terrified to undertake a project with solid rivets and needing to conjure sufficient skills to wield a pneumatic rivet driver and bucking bar to achieve 14000-plus decent – let alone perfect – results. OMG!
My build has officially begun. Even before I can complete the very first step of constructing the empennage, I had to enlarge mounting holes to accommodate M4 rivnut – blind fasteners. The process went well and I’m very glad to be underway.
I’m waiting for a #19 straight chucking reamer to arrive on Tuesday. Then I can enlarge screw clearance holes corresponding to the rivnuts.
I ordered my quick-build kit in July and I’ve had my empennage sub-kit since August, but have yet to pull my first rivet. I’m finding that it’s taking many hours for research and for me to learn enough background information to make confident choices that will set the direction and metrics I will endeavor to satisfy as I build. I think that’s part of the fun.
Surface priming – materials and techniques – is a significant matter. I’m still wrangling a bit with that, but have determined that I have to be practical, or I’m never going to put pen to paper, so to speak. My priming standards are going to fall somewhere closer to the minimum of bare aluminum rather than the extraordinarily high level demonstrated by the truly awesome work of Pascal Latten for his Sling 2 build. Spray painting can be a messy and tedious business. I’m not a professional and I want to keep things clean and simple as possible, while achieving a worthwhile result. In a nutshell, I’m going to use RustOleum self-etching aerosol primer for most internal mating surfaces. For more exposed areas, such as the hinge areas and outward facing structure of the horizontal and vertical stabilizer assembies, I’ll use Alumiprep 33 and Alodine 1201, coated with more durable PTI 2 part epoxy primer – and ultimately the final color top coat.
Wiring, VOR antenna and external lighting choices figure in early for the empennage build.
Aveo Engineering produces what I think is the best option for the anti-collision light atop the rudder. For reasons that included fit, features and color, I’ve opted for the aviation red Posistrobe MiniMax to complement Aveo 3-in-1 nav/position/strobe lights on the wingtips – exact model number of the wingtip lights TBD. Without a huge amount of work, and or ready access to a completed Sling 2, it’s really mostly an educated guess that the overall lighting results will satisfy FAR 23.1385 – 23.1401. Hopefully it will and the DAR will agree.
Working through the electrical current requirements of the LED rudder strobe against AC 43.13B, I’ve tried to determine the necessary gauge and then acquire M27500 shielded cable to replace the TAF-supplied PVC jacketed wire in the kit. Based on actual experience with such wire in my Warrior, I’m not impressed with its suitability for aircraft applications. Based on my calculations, I think readily available 22 gauge conductors would be sufficient to handle peak current less than 3A over a run of 20ft. But, based on some data from the awesome builder I mentioned earlier, it’s possible that 20 gauge wire would be a better choice. I ordered some M27500-20TG4T14 from WireMasters. The minimum order was 100ft. This wire may turn out to be overkill for the small LED light. We’ll see.
The VOR/GS antenna gets built into the vertical stabilizer, so I have to make a commitment to that, even before I’ve settled on my avionics choices. I’m hopeful that conformance with FAA TSO: C34e, C36e, C40c will make my choice compatible with whatever I finally choose for a VOR/GS receiver. Keeping the antenna price down will also make it easier to go with only a GPS navigator. At least the antenna and wiring will be in place. I’ve opted for the Rami AV-520 which has 2.5in diameter base “puck” with removable whips, built-in balun and coax connection.
I’m aiming for an advanced IFR all-Garmin EFIS panel with autopilot. We’ll see where it ends up.
I’ve ordered a bunch of stuff and it will be here next week. I’m perilously close to the official start my Sling 2 build.